#Chitral: came from the #SRSP. The 120 feet long #bridge was completed within a short period of 10 months. Local people at a function held to open the bridge said that the #Sarghuz bridge was damaged in 2009 when a rock fell on it.
#CHITRAL: Nov 3: A new bridge connecting #Sarghuz village with #Mastuj in upper #Chitral was opened on Monday. The #bridge was constructed at a cost of Rs.6.5 million 20% of which was contributed by the local community (Rs.0.64 million) and the rest came from